[{"data":1,"prerenderedAt":157},["ShallowReactive",2],{"service:\u002Fen\u002Fservices\u002Ftender-project-advisory":3},{"id":4,"title":5,"approach":6,"body":29,"deliverables":36,"description":33,"extension":58,"footerCta":59,"hero":66,"locale":84,"meta":85,"midCta":86,"navigation":90,"path":91,"projects":92,"seo":115,"slug":118,"stats":119,"stem":131,"testimonials":132,"workflow":140,"__hash__":156},"services\u002Fen\u002Fservices\u002Ftender-project-advisory.md","Tender Project Advisory",{"heading":7,"image":8,"points":13,"secondary":23,"primary":26},"A good scheme still loses money if it is badly tendered",{"src":9,"alt":10,"width":11,"height":12},"\u002Fimg\u002Fservices\u002Fmoney.jpg","Reviewing tender documentation with an engineering team",1200,900,[14,17,20],{"heading":15,"body":16},"Specifications contractors can price","Scope, performance requirements and interfaces written so bidders quote the same thing — which is what makes the prices you receive comparable.",{"heading":18,"body":19},"Independent bid evaluation","We score the technical offers against the scheme they are meant to deliver, and tell you where a cheap bid has quietly removed something you need.",{"heading":21,"body":22},"The engineer in the room","Our team sits with you through clarification rounds and negotiation, so the technical case is defended by the people who built it.",{"label":24,"to":25},"Talk to our energy experts","\u002Fproduct-demo\u002F",{"label":27,"to":28},"Start for free","https:\u002F\u002Ftessa.planeto-energy.ch?ref=website",{"type":30,"value":31,"toc":32},"minimark",[],{"title":33,"searchDepth":34,"depth":34,"links":35},"",2,[],{"eyebrow":37,"heading":38,"cards":39},"What the engagement delivers","Everything it takes to design a tender-winning project",[40,45,50,54],{"id":41,"eyebrow":42,"title":43,"body":44},"technical-specifications","For engineering offices","Technical specifications","Plant, network and substation requirements written to a level of detail that leaves no room for interpretation at bid stage.",{"id":46,"eyebrow":47,"title":48,"body":49},"evaluation-framework","For utilities & service providers","Evaluation framework","Weighted criteria agreed before the bids arrive, so the award decision is defensible to your board and to unsuccessful bidders.",{"id":51,"eyebrow":42,"title":52,"body":53},"bid-comparison","Bid comparison report","A side-by-side technical and commercial analysis of every offer, with the exclusions and assumptions each bidder has made.",{"id":55,"eyebrow":47,"title":56,"body":57},"risk-register","Risk register & contract input","The technical risks worth transferring, the ones worth keeping, and the performance guarantees that should sit in the contract.","md",{"heading":60,"body":61,"primary":62,"bullets":63},"Not sure a network pays in your area?","Send us the perimeter and whatever data you have. We will tell you whether a full feasibility study is worth your money.",{"label":24,"to":25},[64,65],"Independent of equipment suppliers and EPC contractors","Swiss-based engineering team",{"eyebrow":67,"heading":68,"subhead":69,"primary":70,"image":71,"expect":75},"Area of expertise","Tender & project advisory","Hands-on support preparing tender-ready documentation. We turn a feasibility study into specifications contractors can price, and help you judge the bids that come back.",{"label":24,"to":25},{"src":72,"alt":73,"width":74,"height":74},"\u002Fimg\u002Fservices\u002Fdoc.jpg","Tender documentation for a district heating project",800,{"title":76,"rows":77},"What to expect",[78,81],{"label":79,"value":80},"Deliverable","Tender-ready document set",{"label":82,"value":83},"Best used","Between study and procurement","en",{},{"heading":87,"body":88,"primary":89},"Take your project to market with confidence","Send us your study and we will tell you what is still missing before it can go out to tender.",{"label":24,"to":25},true,"\u002Fen\u002Fservices\u002Ftender-project-advisory",{"heading":93,"items":94},"Discover the projects designed by our energy experts",[95,106,110],{"id":96,"image":97,"imageAlt":98,"title":99,"company":100,"tags":101,"href":105},"project-1","\u002Fimg\u002Fservices\u002Fproject-placeholder.png","Reference district energy project","Project title, Location","Client name",[102,103,104],"Shallow geothermal","Heating","Cooling","\u002Fcustomer-stories\u002F",{"id":107,"image":97,"imageAlt":98,"title":99,"company":100,"tags":108,"href":105},"project-2",[109,103],"Waste heat",{"id":111,"image":97,"imageAlt":98,"title":99,"company":100,"tags":112,"href":105},"project-3",[113,114,103],"Solar","Multi-injection points",{"title":116,"description":117},"Tender & Project Advisory for Thermal Networks - Planeto","Hands-on support preparing tender-ready documentation for district heating and cooling projects: specifications, bid evaluation and independent technical review.","tender-project-advisory",[120,124,127],{"accentPrefix":121,"value":122,"label":123},"1"," partner","From study to signed contract",{"value":125,"label":126},"100%","Supplier-independent evaluation",{"accentPrefix":128,"value":129,"label":130},"3"," weeks","To a complete tender pack","en\u002Fservices\u002Ftender-project-advisory",[133],{"id":134,"quote":135,"name":136,"role":137,"company":138,"photo":139},"loic","We needed a solution that could support our design decisions and optimize projects from the ground up. We're finally able to do just that — saving time, improving accuracy, and ensuring we make the best possible impact with each project.","Loic Quiquerez","Expert Advisor in Geothermal Energy and District Heating & Cooling","SIG","\u002Fimg\u002Ftestimonials\u002Floic.jpg",{"heading":141,"intro":142,"steps":143},"4-step workflow","A rigorous, engineering-first sequence designed to take your district energy project from blank canvas to constructible, tender-ready reality.",[144,147,150,153],{"title":145,"body":146},"Scope freeze","The scheme, phasing and performance targets the tender must procure are agreed and locked.",{"title":148,"body":149},"Document build","Technical specifications, drawings, data sheets and evaluation criteria are drafted.",{"title":151,"body":152},"Bid evaluation","Offers are scored on a like-for-like basis, with the gaps and exclusions surfaced.",{"title":154,"body":155},"Negotiation support","We stay on the call through clarifications, award and contract close-out.","9eOp9ZiybZD1LrWtJ7M2eIXYV5o_VVJEAFWNla8fXeA",1790003259117]